Search function temporarily offline.
Home Projects Publications R&D Applications Software Data Contact
Research Programs
Products/Services
Facilities
Organization (Branches)
Events Calendar
EXPERTISE ...
Coastal Structures
Coastlines
Data Collection
Dredging
Erosion Control
Estuaries
Fish Passage
Flood Control
Groundwater
Harbors
Hydraulic Structures
Inlets
Navigation
Rivers
Soils/Sediments
Warfighter Support
Watersheds
Waves
Wetlands
R&D Applications
Glossary
Other Resources
Chicago, IL Lakefront
Completed Project
Model testing of step revetment configuration.
Model testing of step revetment configuration.
Enlarge: 1280x1024(248kb)
Description: Much of the existing lakefront for the City of Chicago was created as a large landfill project in the 1920’s and 1930’s. The project was protected from waves by a stepped-stone revetment that has fallen into disrepair.

Issue: The U.S. Army Engineer District, Chicago (LRC), requested that the CHL conduct a physical model study to measure overtopping rates for various cross-sectional configurations of a proposed stepped revetment for the Chicago lakefront. The new revetment is being planned as part of the Chicago Shoreline Storm Damage Reduction Project.

Supporting Technology: Physical model studies at a 1:38 (model:prototype) scale were conducted in a two-dimensional wave flume equipped with a computer-controlled wave generator. Design storm parameters were determined by LRC based on wave hindcasts and measured wave conditions.

Benefits: Overtopping rates measured in a physical model will aid in selection of cross-section configuration and design of drainage system.

Sponsors: U.S. Army Engineer District, Chicago (LRC).

Location^^%Field%|Sponsors^^%Field%|Partners^^%Field%|Owner^^%Field%|Status^^%Field%|Engineers^^%Field%|Contractors^^%Field%|Model Studies^^%Field%

Coastal and Hydraulics Laboratory - Engineer Research and Development Center
Waterways Experiment Station - Vicksburg, Mississippi
Web Master
Print Page Content...
 Just the Facts
Download the Fact Sheet
 Contacts
Ward, Donald
Project Manager
Melby, Jeffrey
Group Leader
 Branch Expertise
Coastal Structures Group~Groups;10
 Research & Test Facilities
18-in and 3-ft Wave Flume Facility
 CHL Expertise
Flood Control
Hydraulic Structures
 Branches
Harbors, Entrances, and Structures Branch